River Morphodynamic Evolution Under Dam-Induced Backwater: An Example from the Po River (Italy)

Vittorio Maselli (Corresponding Author), Claudio Pellegrini, Fabrizio Del Bianco, Alessandra Mercorella, Michael Nones, Luca Crose, Massimo Guerrero, Jeffrey A. Nittrouer

Research output: Contribution to journalArticle

3 Citations (Scopus)

Abstract

River systems evolve in response to the construction of dams and artificial reservoirs, offering the possibility to investigate the short-term effects of base level oscillations on fluvial architecture. A major effort has been dedicated to the understanding of river response downstream of large dams, where deep channel incisions occur in response to the removal of sediment that is sequestered in the upstream reservoir. Integrating field observations and numerical-modeling results, this work quantifies the sedimentary and morphological changes of the Po River (Italy) upstream of the Isola Serafini dam to investigate the impact of dam-induced backwater on river morphodynamics. The construction of a reservoir generates a new base level that forces an upstream shift of alluvial lithofacies and a change in the planform geometry of the river. The lateral migration rate of the channel is up to 45 m/yr upstream of the influence of backwater flow and ca. 10 m/yr at the transition from normal to backwater flow conditions (30 km from the dam). Within this reach, a reduction of the bed shear stress promotes deposition of coarse-grained sediment and the emergence of the gravel–sand transition of the river. The lateral migration of the channel continuously decreases over time, and rates < 5 m/yr can be observed in the reservoir backwater zone. This trend is accompanied by the drowning of channel bars, the reduction of river competence, and an increase in bedform spacing. Oscillatory backwater and drawdown surface water profiles can be observed closer to the dam, which are associated with varying low-discharge and high-discharge events, respectively. While low-flow conditions, persisting for much of the year, allow the deposition of fine-grained sediment, high-discharge events promote not only the resuspension and transport of fine material but also the progressive erosion of channel bars and the overall deepening of the thalweg. This study provides a clear picture of the river evolution in response to the construction of a hydropower dam that may be of help in predicting how other fluvial systems will respond to future human interventions. Moreover, the result of how changes in base level and oscillations in water surface profile (backwater and drawdown) control river hydro-morphodynamics and sediment transport may provide new insights when reconstructing ancient fluvial and deltaic sequences.
Original languageEnglish
Pages (from-to)1190-1204
Number of pages15
JournalJournal of Sedimentary Research
Volume88
Issue number10
DOIs
Publication statusPublished - 16 Oct 2018

Fingerprint

backwater
morphodynamics
dam
river
drawdown
river evolution
oscillation
thalweg
surface water
bottom stress
fine grained sediment
bedform
lithofacies
resuspension
low flow
sediment
river system
shear stress
sediment transport
spacing

Keywords

  • Po River
  • backwater
  • drawdown
  • lateral river migration
  • meander
  • gravel-sand transition

Cite this

Maselli, V., Pellegrini, C., Del Bianco, F., Mercorella, A., Nones, M., Crose, L., ... Nittrouer, J. A. (2018). River Morphodynamic Evolution Under Dam-Induced Backwater: An Example from the Po River (Italy). Journal of Sedimentary Research, 88(10), 1190-1204. https://doi.org/10.2110/jsr.2018.61

River Morphodynamic Evolution Under Dam-Induced Backwater : An Example from the Po River (Italy). / Maselli, Vittorio (Corresponding Author); Pellegrini, Claudio; Del Bianco, Fabrizio ; Mercorella, Alessandra; Nones, Michael; Crose, Luca; Guerrero, Massimo; Nittrouer, Jeffrey A.

In: Journal of Sedimentary Research, Vol. 88, No. 10, 16.10.2018, p. 1190-1204.

Research output: Contribution to journalArticle

Maselli, V, Pellegrini, C, Del Bianco, F, Mercorella, A, Nones, M, Crose, L, Guerrero, M & Nittrouer, JA 2018, 'River Morphodynamic Evolution Under Dam-Induced Backwater: An Example from the Po River (Italy)' Journal of Sedimentary Research, vol. 88, no. 10, pp. 1190-1204. https://doi.org/10.2110/jsr.2018.61
Maselli V, Pellegrini C, Del Bianco F, Mercorella A, Nones M, Crose L et al. River Morphodynamic Evolution Under Dam-Induced Backwater: An Example from the Po River (Italy). Journal of Sedimentary Research. 2018 Oct 16;88(10):1190-1204. https://doi.org/10.2110/jsr.2018.61
Maselli, Vittorio ; Pellegrini, Claudio ; Del Bianco, Fabrizio ; Mercorella, Alessandra ; Nones, Michael ; Crose, Luca ; Guerrero, Massimo ; Nittrouer, Jeffrey A. / River Morphodynamic Evolution Under Dam-Induced Backwater : An Example from the Po River (Italy). In: Journal of Sedimentary Research. 2018 ; Vol. 88, No. 10. pp. 1190-1204.
@article{44ba5d3a314b4d458316693fc7fac93c,
title = "River Morphodynamic Evolution Under Dam-Induced Backwater: An Example from the Po River (Italy)",
abstract = "River systems evolve in response to the construction of dams and artificial reservoirs, offering the possibility to investigate the short-term effects of base level oscillations on fluvial architecture. A major effort has been dedicated to the understanding of river response downstream of large dams, where deep channel incisions occur in response to the removal of sediment that is sequestered in the upstream reservoir. Integrating field observations and numerical-modeling results, this work quantifies the sedimentary and morphological changes of the Po River (Italy) upstream of the Isola Serafini dam to investigate the impact of dam-induced backwater on river morphodynamics. The construction of a reservoir generates a new base level that forces an upstream shift of alluvial lithofacies and a change in the planform geometry of the river. The lateral migration rate of the channel is up to 45 m/yr upstream of the influence of backwater flow and ca. 10 m/yr at the transition from normal to backwater flow conditions (30 km from the dam). Within this reach, a reduction of the bed shear stress promotes deposition of coarse-grained sediment and the emergence of the gravel–sand transition of the river. The lateral migration of the channel continuously decreases over time, and rates < 5 m/yr can be observed in the reservoir backwater zone. This trend is accompanied by the drowning of channel bars, the reduction of river competence, and an increase in bedform spacing. Oscillatory backwater and drawdown surface water profiles can be observed closer to the dam, which are associated with varying low-discharge and high-discharge events, respectively. While low-flow conditions, persisting for much of the year, allow the deposition of fine-grained sediment, high-discharge events promote not only the resuspension and transport of fine material but also the progressive erosion of channel bars and the overall deepening of the thalweg. This study provides a clear picture of the river evolution in response to the construction of a hydropower dam that may be of help in predicting how other fluvial systems will respond to future human interventions. Moreover, the result of how changes in base level and oscillations in water surface profile (backwater and drawdown) control river hydro-morphodynamics and sediment transport may provide new insights when reconstructing ancient fluvial and deltaic sequences.",
keywords = "Po River, backwater, drawdown , lateral river migration, meander, gravel-sand transition",
author = "Vittorio Maselli and Claudio Pellegrini and {Del Bianco}, Fabrizio and Alessandra Mercorella and Michael Nones and Luca Crose and Massimo Guerrero and Nittrouer, {Jeffrey A.}",
year = "2018",
month = "10",
day = "16",
doi = "10.2110/jsr.2018.61",
language = "English",
volume = "88",
pages = "1190--1204",
journal = "Journal of Sedimentary Research",
issn = "1527-1404",
publisher = "SEPM Society for Sedimentary Geology",
number = "10",

}

TY - JOUR

T1 - River Morphodynamic Evolution Under Dam-Induced Backwater

T2 - An Example from the Po River (Italy)

AU - Maselli, Vittorio

AU - Pellegrini, Claudio

AU - Del Bianco, Fabrizio

AU - Mercorella, Alessandra

AU - Nones, Michael

AU - Crose, Luca

AU - Guerrero, Massimo

AU - Nittrouer, Jeffrey A.

PY - 2018/10/16

Y1 - 2018/10/16

N2 - River systems evolve in response to the construction of dams and artificial reservoirs, offering the possibility to investigate the short-term effects of base level oscillations on fluvial architecture. A major effort has been dedicated to the understanding of river response downstream of large dams, where deep channel incisions occur in response to the removal of sediment that is sequestered in the upstream reservoir. Integrating field observations and numerical-modeling results, this work quantifies the sedimentary and morphological changes of the Po River (Italy) upstream of the Isola Serafini dam to investigate the impact of dam-induced backwater on river morphodynamics. The construction of a reservoir generates a new base level that forces an upstream shift of alluvial lithofacies and a change in the planform geometry of the river. The lateral migration rate of the channel is up to 45 m/yr upstream of the influence of backwater flow and ca. 10 m/yr at the transition from normal to backwater flow conditions (30 km from the dam). Within this reach, a reduction of the bed shear stress promotes deposition of coarse-grained sediment and the emergence of the gravel–sand transition of the river. The lateral migration of the channel continuously decreases over time, and rates < 5 m/yr can be observed in the reservoir backwater zone. This trend is accompanied by the drowning of channel bars, the reduction of river competence, and an increase in bedform spacing. Oscillatory backwater and drawdown surface water profiles can be observed closer to the dam, which are associated with varying low-discharge and high-discharge events, respectively. While low-flow conditions, persisting for much of the year, allow the deposition of fine-grained sediment, high-discharge events promote not only the resuspension and transport of fine material but also the progressive erosion of channel bars and the overall deepening of the thalweg. This study provides a clear picture of the river evolution in response to the construction of a hydropower dam that may be of help in predicting how other fluvial systems will respond to future human interventions. Moreover, the result of how changes in base level and oscillations in water surface profile (backwater and drawdown) control river hydro-morphodynamics and sediment transport may provide new insights when reconstructing ancient fluvial and deltaic sequences.

AB - River systems evolve in response to the construction of dams and artificial reservoirs, offering the possibility to investigate the short-term effects of base level oscillations on fluvial architecture. A major effort has been dedicated to the understanding of river response downstream of large dams, where deep channel incisions occur in response to the removal of sediment that is sequestered in the upstream reservoir. Integrating field observations and numerical-modeling results, this work quantifies the sedimentary and morphological changes of the Po River (Italy) upstream of the Isola Serafini dam to investigate the impact of dam-induced backwater on river morphodynamics. The construction of a reservoir generates a new base level that forces an upstream shift of alluvial lithofacies and a change in the planform geometry of the river. The lateral migration rate of the channel is up to 45 m/yr upstream of the influence of backwater flow and ca. 10 m/yr at the transition from normal to backwater flow conditions (30 km from the dam). Within this reach, a reduction of the bed shear stress promotes deposition of coarse-grained sediment and the emergence of the gravel–sand transition of the river. The lateral migration of the channel continuously decreases over time, and rates < 5 m/yr can be observed in the reservoir backwater zone. This trend is accompanied by the drowning of channel bars, the reduction of river competence, and an increase in bedform spacing. Oscillatory backwater and drawdown surface water profiles can be observed closer to the dam, which are associated with varying low-discharge and high-discharge events, respectively. While low-flow conditions, persisting for much of the year, allow the deposition of fine-grained sediment, high-discharge events promote not only the resuspension and transport of fine material but also the progressive erosion of channel bars and the overall deepening of the thalweg. This study provides a clear picture of the river evolution in response to the construction of a hydropower dam that may be of help in predicting how other fluvial systems will respond to future human interventions. Moreover, the result of how changes in base level and oscillations in water surface profile (backwater and drawdown) control river hydro-morphodynamics and sediment transport may provide new insights when reconstructing ancient fluvial and deltaic sequences.

KW - Po River

KW - backwater

KW - drawdown

KW - lateral river migration

KW - meander

KW - gravel-sand transition

U2 - 10.2110/jsr.2018.61

DO - 10.2110/jsr.2018.61

M3 - Article

VL - 88

SP - 1190

EP - 1204

JO - Journal of Sedimentary Research

JF - Journal of Sedimentary Research

SN - 1527-1404

IS - 10

ER -